Wire and cable common sense question and answer

6 years ago 1839 0 News

power cable.png

1. Why should a return line installed along the cable be installed in the grounding mode of the single-core cable sheath at one end?

Answer: In the cable line grounded at one end of the metal sheath, in order to ensure that the induced voltage in the sheath does not exceed the allowable standard, a conductor laid along the cable line in parallel must be installed, and both ends of the conductor are grounded. Streamlined. When a single-phase ground fault occurs, the ground short-circuit current can flow back to the system center point through the return line, and the magnetic flux generated by the ground current through the return line cancels the magnetic flux generated by the ground current of a part of the cable lead, thereby reducing The induced voltage of the sheath in the event of a short circuit fault.


2. Can a cable project be divided into several projects?

answer:

(1) Construction site transportation: including loading and unloading, transportation and empty return of engineering materials from warehouse to construction site.

(2) Local engineering: including road excavation, tunneling, and channel construction.


(3) Laying work: including laying, intermediate head making, shovel cover, buried pipe, school tide, production of traction head, etc.

(4) Both ends of the project: including the production and installation of the branch, the suspension bridge and its foundation, the production of the terminal head, the installation of the oil pressure and signal device, and the electrical performance test of the name.

(5) Stopping works: including the production of oil-filled cable plugs, the installation of fuel tanks, automatic drainage and signal devices.

(6) Grounding engineering: including insulation joints, transposition boxes, protectors, grounding box installation, etc.


3. What inspections should be carried out on the acceptance of cable lines?

Answer: (1) The cable specifications should meet the requirements, the arrangement should be neat, no damage, the signs are complete, correct and clear;

(2) The fixed bending radius of the cable, the relevant distance and the wiring of the metal sheath of the single-core power cable shall meet the requirements;

(3) The cable terminal and the middle head are not leaking oil, and the installation is firm. The oil pressure of the oil-filled cable and the setting value of the meter should meet the requirements;


(4) Good grounding;

(5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted;

(6) There should be no debris in the cable trench, tunnel and bridge, and the cover is complete.


INQUIRY
主站蜘蛛池模板: 人妻熟女视频一区二二区 | 亚洲综合激情五月丁香六月 | 黄色在线观看免费 | 国产精品色吧国产精品 | 亚洲精品无码aⅴ中文字幕蜜桃 | 亚洲精品影视在线观看 | 伊人一区 | 日韩一区二区在线观看 | 狠狠躁天天躁中文字幕 | 深爱五月综合缴情综合网 | 九九精品视频在线观看 | 一级片视频免费 | 国产三线在线 | 91在线高清观看 | 国产精品久久久久久久久免费相片 | 最新av在线网址 | 国产免费一级 | 穿书自救指南2樱花动漫免费观看 | 午夜裸体女人视频网站在线观看 | 午夜精品久久久久久久99 | 久久在线观看视频 | 国产精品91av | 亚洲精品乱码久久久久久9色 | 欧美一区二区在线看 | 99久久久久国产精品免费 | 91不卡视频 | 亚洲最新av无码中文字幕一区 | 黄色毛片子 | 中文字幕精品AV乱码在线 | 国产精品国产三级国产AV中文 | 久久久久久逼 | 精品精品视频 | 国产精品美女久久久久av毛片 | 五月婷婷综合国产成人一区二区三区 | 成人午夜精品久久久久久久3d | 欧美国产片 | 成人18视频免费69 | 欧美国产精品天堂 | 男女午夜猛烈啪啦啦视频 | 在线中文字幕网 | 人人揉人人捏人人爽五月天 |