What issues should be noted during the construction of power cables?

2 years ago 1570 0 News

1553740595585559.jpg


Problems to be Noted During the Construction of Power Cables


Cable Laying Method


The laying methods of the cable include direct burial laying, pipe laying, shallow groove laying, cable trench laying, cable tunnel laying, and overhead laying. 

In terms of skill comparison, cable tunneling methods and cable trenching methods are the best methods of laying, as these two methods facilitate cable construction, maintenance, and repair. 

In some developed cities, when planning and building cities, they have thought about sharing tunnels. 

The practice has proved that the shared tunnel operation is outstanding, which greatly reduces the number of repeated investments and the repeated excavation of the road surface, but the initial investment is endless.


Cable Selection


Commonly used power cables include oil-immersed cables, PVC-insulated cables, and cross-linked polyethylene cables. 

They are extended to different types of special cables depending on the application. 

Now, with the continuous improvement of production skills and production processes, XLPE cables have become the most widely used cable products. 

When selecting cables, they should be selected according to the different environments and conditions used. When using the direct burial and shallow trough laying methods, consider the use of steel cables.


Selection of Cable Cross-Sectional Area


The selection of the cable cross-sectional area is related to the amount of capital contribution, the loss of the line and the voltage quality, and the service life of the cable. 

Therefore, based on the results of the load guessing, use the developed vision to select the appropriate cross-sectional area.

So that the power cable is satisfied with the core temperature request and voltage drop request under the maximum operating current, and the thermal stability request under the maximum short-circuit current. 

Because the load guessing operation is difficult and the accuracy is low, when selecting the cable cross-sectional area, it is also satisfied with the request of the “Urban Medium and Low Voltage Distribution Network Transformation Skills Guide” and the “Urban Power Network Planning Guidelines”.


For Cable Network and Cable Network Automation


Following the continuous implementation and application of power cables in the distribution network, the distribution network can be divided into cable networks and overhead networks (including overhead and cable hybrid networks). 

"The implementation status and compensation for the "Urban Medium and Low Voltage Distribution Network Transformation Skills Guide" also made specific requests for cable distribution network automation. 

Therefore, when selecting the cable network in the regional network distribution network, new skills, and new equipment should be selected according to the request of distribution automation. 

If there are conditions, it is necessary to think about the automation pilot operation. 

When the conditions are not mature, the supporting equipment should be selected. 

Thinking is well taken to lay the groundwork for completing the automation plan.


INQUIRY
主站蜘蛛池模板: 欧美一及 | 国产天堂第一区 | 久久精品夜夜夜夜夜久久 | 国产无遮挡18禁无码网站免费 | 在线观看免费人成视频色 | 精品久久久久久久久久久久久久久久久久久 | av片在线观看永久免费 | 一本到无码av专区无码不卡 | 91免费版网址 | 国内一级大片 | 亚洲综合无码精品一区二区三区 | 国产精品久久偷人妻 | 亚洲国产高清在线 | 99精产国品一二三产品香蕉 | 久久99精品视频一区97 | 欧美精品一区二区免费 | 久久99青青精品免费观看 | 国色天香乱码区 | 日本久久久久一级毛片 | 中国一级毛片 | 国产午夜免费视频 | 国产一级二级日本在线 | 大地资源中文在线观看官网在线 | 亚洲AV午夜成人片 | 好吊日好吊操在线视频 | 三级在线观看网站 | 国产精品自拍在线观看 | 国产伦码精品一区二区三区 | 一本一道人人妻人人妻αv 美女全黄视频 | 女人第一次久久久www | 少妇性色午夜淫片aaa播放5 | 亚洲欧洲日韩在线观看 | 亚洲不卡无码永久在线观看 | 亚色av| 中国人与拘一级毛片 | 国产精品入口免费 | 欧美亚洲一区在线观看 | 国产精品99久久久久久人 | 亚洲乱亚洲乱妇24p 69久久国产露脸精品国产 | 亚洲精品无码一区二区三区在线高 | 国产一级片每日更新 |