What are the treatment methods for XLPE power cables with moisture?

2 years ago 1504 0 News


  1540432581164829.jpg


XLPE Power Cable Moisture Treatment Method



In urban power grid reconstruction projects, cables, especially polyethylene insulated power cables, have been widely used. 

However, due to the particularity of the cable, there are special requirements for the installation, operation and maintenance of the cable. 

Cable dampness or water ingress reduces the insulation resistance of the cable, which is an important aspect of the cable line running accident.


Causes and Hazards of Cable Flooding


(1) When the new whole cable is shipped from the factory, both ends are sealed with plastic sealing sleeves. 

However, after the construction site is used according to the actual situation, the remaining part is simply wrapped with plastic cloth to break the gap. 

It is placed in the open air and the seal is not good. For a long time, it will inevitably have water vapor infiltrated into the cable.


(2) When laying cables, it is necessary to frequently cross roads, bridges and culverts. 

Due to weather or other reasons, a lot of water is often accumulated in the cable trenches. 

In the process of laying, it is inevitable that the cable heads will be immersed in water. 

Because the plastic cloth is not tightly wrapped or broken, the water enters the cable.

In addition, when the traction and the pipe are worn, the outer sheath or even the steel shovel is sometimes scratched. 

This phenomenon is particularly prominent when using mechanical traction.


(3) After the cable laying is completed, the cable head is not produced in time due to the limitation of on-site construction conditions。

So that the unsealed cable breakage is exposed to the air for a long time, even immersed in water, so that the water vapor enters the cable in large quantities.


(4) During the cable head making process (including the terminal head and the intermediate joint), the newly processed cable ends may accidentally fall into the accumulated water in the site due to the negligence of the construction personnel.


(5) In the normal operation of the cable, if a failure such as breakdown occurs for some reason, the water in the cable trench will enter the cable inside the fault point.

In civil construction, especially when using large construction machinery.

It is not uncommon for a construction site to have cable breakage or breakdown due to various human factors. 

In the event of such an accident, cable insulation is severely damaged and the cable is also flooded.


After the cable enters the water, under the action of the electric field, aging will occur, and finally the cable will break down.


INQUIRY
主站蜘蛛池模板: 欧美成人精品三级一二三在线观看 | 欧美日韩在线高清 | 日韩经典中文字幕 | 日本三区三区三区二区二区二区高清在线 | 老人把我添到了高潮A片 | 日韩国产在线看 | 国产精品免费播放 | 黄带一级片 | 亚洲色无码A片一区二区情欲 | 国产毛片毛多水多的特级毛片 | 国产精品无码一区二区三区免费 | 视频一区二区精品 | 婷婷激情影院 | 国产高清不卡一区二区三区 | 亚洲欧美视屏 | 亚洲综合无码一区二区加勒此 | 小伙和少妇干柴烈火 | 欧美熟妇一区二区三区蜜桃视频 | 一个色综合网 | 观看免费av| 97国产精品最好的产品 | 久久久久久久高清 | 自拍偷拍亚洲欧美 | 狼亚洲AV无码专区在线播放中文 | 亚洲VA在线∨A天堂VA欧美VA | 国产精品久久久久久久hd | 日韩av一区二区在线观看 | 台湾佬中文娱乐久久久 | 日本大学生黄色片 | 天天做夜夜做狠狠做 | 欧美又粗又长又爽做受 | 黑人巨大无码中文字幕无码 | 国产做a爰片久久毛片a片 | 国产又猛又黄又爽 | 日韩精品人妻系列无码专区免费 | 老司机一区二区 | 亚洲国产中文精品综合久久 | 色久影院 | 国产成人精品福利视频 | 18禁黄污无遮挡无码网站 | 无码中文人妻在线一区 |