女人张开腿让男桶喷水高潮_国内精品免费一区二区2001_日韩综合在线播放_麻豆在网站1区_欧美日韩在线视频首页_天天狠天天天天透在线

sales@zmscable.com

What are the treatment methods for XLPE power cables with moisture?

2 years ago 1626 0 News

1540871221281715.jpg


  • XLPE Power Cable Moisture Treatment Method



In urban power grid reconstruction projects, cables, especially polyethylene insulated power cables, have been widely used. 

However, due to the particularity of the cable, there are special requirements for the installation, operation and maintenance of the cable. 

Cable dampness or water ingress reduces the insulation resistance of the cable, which is an important aspect of the cable line running accident.


Causes and Hazards of Cable Flooding


(1) When the new whole cable is shipped from the factory, both ends are sealed with plastic sealing sleeves. 

However, after the construction site is used according to the actual situation, the remaining part is simply wrapped with plastic cloth to break the gap. 

It is placed in the open air and the seal is not good. 

For a long time, it will inevitably have water vapor infiltrated into the cable.


(2) When laying cables, it is necessary to frequently cross roads, bridges and culverts. 

Due to weather or other reasons, a lot of water is often accumulated in the cable trenches.

In the process of laying, it is inevitable that the cable heads will be immersed in water. 

Because the plastic cloth is not tightly wrapped or broken, the water enters the cable.

In addition, when the traction and the pipe are worn, the outer sheath or even the steel shovel is sometimes scratched. 

This phenomenon is particularly prominent when using mechanical traction.


(3) After the cable laying is completed, the cable head is not produced in time due to the limitation of on-site construction conditions, so that the unsealed cable breakage is exposed to the air for a long time, even immersed in water, so that the water vapor enters the cable in large quantities.


(4) During the cable head making process (including the terminal head and the intermediate joint), the newly processed cable ends may accidentally fall into the accumulated water in the site due to the negligence of the construction personnel.


(5) In the normal operation of the cable, if a failure such as breakdown occurs for some reason, the water in the cable trench will enter the cable inside the fault point.

In civil construction, especially when using large construction machinery.

It is not uncommon for a construction site to have cable breakage or breakdown due to various human factors. 

In the event of such an accident, cable insulation is severely damaged and the cable is also flooded.


After the cable enters the water, under the action of the electric field, aging will occur, and finally the cable will break down.


Tags:
power cables
INQUIRY
主站蜘蛛池模板: 人人澡av | 免费一级婬片AAA毛片肥肥女 | 久久av每日更新免费观看 | 国产精品色情一区二区三区 | 国产人妻精品久久久久久 | 美女做爰内谢免费网站 | 海角国精产品一区一区三区糖心 | 黄色大片播放 | 亚洲一二三精品 | 250pp亚洲情艺中心在线 | 中国一级特黄真人毛片免费观看 | 国产999精品久久久久久 | 欧美宗合| 国内精品影视无广告 | 日韩精品人妻系列无码专区免费 | av观看成片免费网站 | 一本色道久久综合狠狠躁的推荐 | 亚洲激精日韩激精欧美精品 | 成人性生交大片免费看 | 亚洲精品欧美视频 | 天堂资源在线官网 | 国产妇女馒头高清泬20P多毛 | 国产99热 | 精品国产一区二区三区香蕉事 | 在线国产播放 | 丝袜老师张开腿任我玩弄 | 久久之久 | 国内精品伊人久久久久影院对白 | a国产一区二区免费入口 | 四虎影视在线看免费观看 | 国产短视频在线观看 | 成人av网站免费观看 | 亚洲一卡二卡三卡四卡无卡网站 | 成人做爽爽爽爽免费国产软件 | 色噜噜狠狠一区二区三区 | 色综合一| 黄色免费观看视频 | 欧美亚洲综合在线观看 | 在线一级片 | 日韩视频中文字幕在线观看 | 成年在线网站免费观看无广告 |