女人张开腿让男桶喷水高潮_国内精品免费一区二区2001_日韩综合在线播放_麻豆在网站1区_欧美日韩在线视频首页_天天狠天天天天透在线

sales@zmscable.com

What are the precautions to be taken during overhead cable maintenance tests?

2 years ago 9466 0 News

ABC-cable-1024x343.jpg

Precautions during overhead cable maintenance tests


Overhead cable as part of the power line, its probability of failure is low, safe and reliable, flexible and widely used outlet. But once the failure and maintenance are more difficult, the risk is also large, and therefore the maintenance, and testing should pay special attention.


1. Pre-work preparation

overhead cable outage work should be filled with the first worksheet, and work without power should be filled with a second job ticket. Check out the front work should be a detailed road map, drawings and hidden works of Pareto chart, check the cable must detail the name, the nameplate is consistent with the job ticket is written, before starting work in the correct and reliable security measures.


2. Operating Notes

You must confirm the need to overhaul the cable work. The cable required maintenance can be divided into two kinds:


2.1 And cable terminal head fault surface have cable clear the fault. Such faulty cable, the more obvious signs of trouble, are easily confirmed.


2.2 Cable surface is not exposed to cable fault points. When the cables for such failure, in addition, to checking data, verify the name of the cable, it must also be identified with the cable identification device, so that the difference between total and charging cable running off the other, especially those with numerous cable in the same section, strict distinguish between required maintenance of cables and another live electric cable is particularly important. 


This will also effectively prevent the cable hanging signs and admit the wrong cable, leading to the wrong diagnosis of energized cables accident. Sawing cable must have reliable security measures. Before sawing cable, it must prove to be a need to cut the cable and the cable is no electricity, and then, with the ground with wooden handle (preferably with an epoxy resin handle) of the soldering iron core driving cable only after work. 


The rotary wooden handle should wear insulated gloves and insulated mat to stand, and should pay special attention to ensure good soldering iron ground. Work To move the cable, you should be careful, should not be foolhardy, to prevent damage to other running cables. The cable heads must be installed according to process requirements to ensure quality, leaving no accidents. After the power cable repair should carefully check the phase ends of the cable, first remove the original mark with color, then put the correct phase color labels to confuse old and new phase colors.


3. When high voltage test

Cable high voltage tests should strictly abide by the "electrical safety work order." Even in the case of poor working conditions in the field safety requirements can not have the slightest decrease. Division of labor must be clear, safety precautions should be carefully arranged. The test site shall be provided with closed masking or fence, hanging out, "stop, dangerous high voltage!" Signs, and sent to guard. 


Especially the other end of the cable must also be sent to guard and keep communication open, to prevent the occurrence of unexpected events. Test equipment and wiring should meet the safety requirements, the operation must be standardized. Attention should be focused on during the test, the operator should stand on the insulating mat. Changes by the end of the line or test, you should first test the power off, discharge, and the high-pressure part shorted to ground high-voltage equipment. 


When the high voltage direct current test, each shall come to an end or the end of the test cable discharge to ground and shorted to the ground several times, only after contact with the cable.


4. Other Considerations

When you open the cable well or cable trench cover, measures should be prepared to prevent traffic accidents. Wells should be arranged around a good fence, do the obvious warning signs, barriers and set the vehicle strayed into the barrier. In the evening, the cable should be well illuminated, preventing pedestrians or vehicles fall into the well. 


Before entering the cable wells, wells should be excluded from the aggregate. Wells staff should wear a helmet, and make fire, water, and anti-altitude falling objects and other measures should be manned wellhead.

INQUIRY
主站蜘蛛池模板: 免费黄色在线观看 | 国产干干| 96在线看片免费视频国产 | 香蕉樱桃水蜜桃猕猴桃菠萝视频 | 中国A级毛片免费观看 | 无码AⅤ免费中文字幕久久 日韩福利一区 | 亚洲精品视频在线播放 | 日本在线免费观看 | 欧美一级片观看 | 欧美中文字幕在线播放 | 91精品欧美一区综合在线观看 | 九九国产精品无码免费视频 | JULIA无码中文一区 | 国产全黄a一级毛片91 | 欧美一级在线观看久 | 久草在线免费福利资源 | 手机看黄AV免费网址 | 免费观看黄色网页 | 法国极品成人h版 | 少妇一级淫片免费看 | 一区二区三区香蕉视频 | 精品亚洲永久免费 | www.青青草.com | 偷拍成人一区亚洲欧美 | 五月婷婷中文字幕 | 在线综合色 | 视频二区无码人妻在线 | 一区二区三区免费观看视频 | 亚洲最大成人影院 | 国产精品欧洲 | 四虎最新在线观看地址 | 国产高清精品一区二区三区 | 91婷婷韩国欧美一区二区 | 毛片毛片毛片毛片毛片毛片 | 国产精品99久久久久久久vr | 日本一本久草 | 福利午夜国产网站在线不卡 | 99久久精品久久久久久ai换脸 | 欧美成人乱码一二三四区 | 人体精品一二三区 | 色久影院 |