What are the inspection procedures for sheathing?

2 years ago 1388 0 News

電纜護套.jpg


Sheath inspection procedures


Test Methods

1 Execute the thickness and outer diameter as per GB/T2951.11

2 To carry out the spark test as per requirements in Form 1.

3 While checking the out-of-roundness, measure the max diameter and min diameter by caliper on the same cross-section and take the max different figure among two sets of figures.

4 Test the sheath surface, section quality, and marking by eyesight in natural light. 

Take a ruler with an accuracy of 1mm to measure the distance between markings.

Test rules

1 Carry out the first test should be carried out on all items in case of first starting the machine or exchange of specifications.

2 Test process rules are in line with requirements in Form 2, test frequency is the requested lowest standard, and increasing the test frequency in the allowed situation is acceptable.


Form 2 Test Rules


No.
Test Item Test rules
Self-test Designed to check
1 Thickness After changing speed, at least twice per drum Once per hour routing test, at least twice per drum
2 Spark Test Once per hour routing test Once per hour routing test
 
3 Outer diameter Once per hour Once per hour routing test, at least twice per drum
4 Out-of-roundness Once per two hours Once per hour routing test
5 Surface Casual test 100% test on semi-finished products, once per hour routing test
INQUIRY
主站蜘蛛池模板: 日日噜噜夜夜爽 | 国产综合视频在线观看 | 91人人视频在线观看 | 免费人成网站www | 精品无人区无码乱码大片国产 | 九九99靖品免费 | 在线精品视频免费观看 | 欧美不卡在线视频 | youjizz中国少妇 | 亚洲精品视频在线播放 | 免费成人午夜 | 91精品久久久久久粉嫩 | 日韩精品人妻系列无码专区 | 日韩加勒比一本无码精品 | 国产高潮流白浆啊免费A片动态 | 亚洲精品四区麻豆文化传媒 | 久久久久久久99精品免费观看 | melody在线观看 | 国产一级不卡视频 | 国产精品亚洲аv久久亚瑟桃花 | 还珠格格第二部1至48集免费观看 | 欧美中文字幕一区 | 国产精品久久久久秋霞鲁丝 | 日韩久久无码免费毛片软件 | 亚洲网中文字幕 | av免费人人干 | 日韩一区二区在线观看 | 老司机狠狠干 | 国产丨综合丨精品入口 | 精品无码人妻一区二区三区 | 天天干天天爱天天操 | 色一区二区三区 | 在线sese | 成年在线网站免费观看无广告 | 亚洲欧美综合一区二区 | 环太平洋免费看 | 国产黄频 | 野花社区视频www | 无码人妻丰满熟妇片毛片 | 国产大陆av | 日本在线免费视频 |