女人张开腿让男桶喷水高潮_国内精品免费一区二区2001_日韩综合在线播放_麻豆在网站1区_欧美日韩在线视频首页_天天狠天天天天透在线

sales@zmscable.com

What are the causes and treatment methods of cable filling with water?

2 years ago 2148 0 News


The Causes and Treatment of Cable Filling with Water


Water Causes

1 Storage

The newly purchased tube-to-tube cable is sealed on both ends with a plastic gland.

But after a while, the remaining cable is not sealed and water vapor penetrates the cable.


2 Cable Laying

When laying a cable, the cable head wrapped in plastic paper is sometimes submerged in water to allow water to enter the cable. 

Occasionally the outer sheath breaks when towing and tubing.

3 After Laying

Not in a timely manner cable production, so that a large number of water vapor into the cable.

4 Cable Head Production

In the cable head production, due to the preparation of the staff of the effect, the cable ends sometimes slip into the cable wells with water.

5 Cable Running

During the operation, the occurrence of intermediate joint breakdown and other failures, cable wells will be along the gap in the water into the cable.

In the construction site, the external force caused by cable damage or breakdown, cable water will occur.

欒1.png

Treatment Method

Drying is very difficult once the water fill into the cable (such as pressurized nitrogen blowing heat), generally do not configure the appropriate equipment. 

In practice, if the cable such as water, just saw the front a few meters, such as the entire cable has been into the water, it is not desirable. 

Therefore, the prevention of water inflow cable, prevention should be based, using the following measures:

1. Cable head should be sealed. The cable ends that have been cut off must be sealed with plastic (using cable-specific glands) to prevent moisture ingress.

2. Cable laying in time for the production of cable head.

3. Strengthen the cable head production process management.

4. Using shrink cable head.

5. 10kV system with 8.7/10kV level of cable. At the same time to thicken the cable insulation.

6. Using PVC plastic double wall corrugated pipe. 

The tube corrosion-resistant, smooth inner wall, good strength and toughness, so laying in the cable buried, can greatly reduce the damage to the outer sheath of the cable.

7. Cable trench (pipe) and cable well design. 

Due to the restriction of the conditions, the cables are laid directly or in the form of cable ditches and are buried in direct burdens.

If they belong to coastal rainy areas, there is water in the cable ditches or cable wells for many years. 

Due to the depth of the cable duct or cable well exceeding the depth of the sewer, drainage is difficult, so coordination should be made during planning to facilitate drainage of the cable duct (well). 

If you can not do cable wells do not accumulate water, then the middle of the cable hole in the bracket propped up. 

In addition, the design of the cable management, as straight as possible to reduce the elbow, the cable easy to lay.

The same time, in the production of cable wells, into a large cable and small cable wells, cable wells can be used to pull the cable.

Doing intermediate joints, and in the middle of the road is not easy to do wire wells, but it must be a corner of the place, changed to a small cable well, the cable well is only used in laying cables divert pulley.


Tags:
PVC
INQUIRY
主站蜘蛛池模板: 日本在线不卡视频一二三区 | xxxxwwww在线观看 | 无码人妻丰满熟妇啪啪区日韩久久 | 热99re久久国免费超精品首页 | 精品自拍一区 | 精品久久久久久久久久久久久久久久 | 欧美视频自拍 | 欧美A级毛欧美1级A大片 | 日本xxxx视频 | 精品自拍最新换脸综合网站 | 懂色av一区二区三区观看 | 国产亚洲精品久久久久久国模美 | 无码内射成人免费喷射 | 欧美精品久久一区二区 | 丰满少妇被猛烈进入毛片 | 久久久91麻豆精品国产一区 | 亚洲一区二区欧美日韩 | 涩涩网站在线观看 | 国产又黄又硬又湿又黄的 | 国产亚洲精品视觉盛宴 | 日韩国产欧美精品一区二区三区 | 在线免费黄 | 麻豆视频成人 | 亚洲成色WWW成人网站妖精 | 午夜无人区免费网站 | 欧美黄色一级在线视频 | 最新免费av网站 | 国产痴女资源在线不卡 | 免费毛片视频播放 | 极品少妇xxxx精品少妇偷拍 | 亚洲成av人的天堂在线观看 | 中文字幕一线产区和二线区的区别 | 在线岛国片免费无码AV | 国产毛片久久久久久蜜臂媒 | 在线观看av网页 | 精品一区二区在线看 | 欧美第2页| 韩国久久久久久级做爰片 | 麻花传媒MV国产免费观看视频 | 黑人粗大猛烈进出高潮视频 | 老司机在线观看福利网站视频 |