Top do and don’t – cable delivery, pulling and installation

6 years ago 1398 0 News

cable-1.png

Although present everywhere, cables seldom impact their users; they are usually hidden from view, and, if they are fulfilling their role correctly, require no attention. They should perform reliably for many decades if they have been correctly specified, conform to relevant standards and specifications, carry BASEC or another recognized approval, and have been carefully maintained. Protection from environmental and mechanical stress is also essential.

However, even cables that are sourced responsibly are at risk during initial delivery and installation. During this phase, they will be subjected to movements, stresses and strains – and if these exceed the cable design limits, damage becomes a strong possibility. Even simple issues like snagging on sharp edges can have serious consequences. 


Installation damage can lead to customer dissatisfaction, significant delays in project completion, extra resources being needed, and in particular, additional costs imposed on installers for removing and replacing damaged cables. These problems can be exacerbated if the effects of any damage do not become apparent, potentially affecting the supply of power, control or communications, until after the installation has gone into service.

Below are some top tips for a clean, trouble-free installation:

Cable delivery and cutting to length: Safe handling of cable starts with the supplier, often a distributor or wholesaler. Manufacturers will deliver cables on an appropriately sized drum or reel, loaded under controlled factory conditions. Cutting the cable to length, and reconnecting onto an often-smaller delivery drum can result in over-bending if the drum belly diameter is too small; additionally, the cable may suffer external scuffing damage

Bend radius – armoured cables: Bend radius is a key consideration, particularly for armoured cables and for higher voltages of 11kV or more. Minimum bend radius is generally defined by cable standards, or is advisory; it should be communicated by manufacturers and passed on by suppliers to the installers. Sometimes two figures are used; a dynamic radius for the pull, and a possibly smaller final static radius for when the cable is no longer under tension.

Maximum cable tension and sidewall pressure limits can both cause damage if exceeded when pulling cables. To prevent this, cable installation routing should be closely assessed, and several rollers or guides used at any bend points. A single roller or guide’s external radius is always likely to be much lower than the cable’s minimum bend radius. As a simple rule of thumb, for a four-core armoured cable larger than 40mm OD, a full-sized bicycle wheel should fit within the bend.

Bend radius – screened cables: With screened cables such as BS 7629-1- rated fire alarm types, the minimum bend radius must be maintained to ensure fire integrity. Kinks in the screening or over-tight entry into accessories may compromise fire performance. All such cables will have been fire tested at a specified bend radius, which the manufacturer should communicate to their suppliers and users.

Bend radius monitoring: Monitoring the bend radius on site is not straightforward. Many installers use simple go / no-go templates, but these can sometimes miss the tight parts of bends. Purpose-designed radius gauges can measure extremely accurately, providing reassurance that a cable installation has been completed correctly and safely.

Cable pulling: Problems can occur where cables are pulled in two directions from a common mid-point. Some cable is initially pulled in one direction, then the remaining cable is laid out from the drum before being pulled in another direction. This approach can cause significant damage to a cable that cannot twist freely during installation, or where loops of cable introduce twists. Damage to armoured can result in bird-caging and sheath splits.

Team of workers pulling cable from access hole 

Avoiding cable torsion when pulling is important, and is largely addressed by using rotating pulling heads and a suitable cable pulling sock. Pulling the cable through a rope will restrict rotation and can create problems. Tension built up around each bend will propagate back down the cable, causing issues nearer the drum.


Conclusion

Competent and experienced cable installation teams, using the correct equipment including tension-monitored winches, pulling socks, and a generous quantity of rollers and guides, should experience fewer problems while ensuring a trouble-free installation.


Tags:
Power Cable
INQUIRY
主站蜘蛛池模板: 午夜春色 | 亚洲国产中文精品综合久久 | 嫩B人妻精品一区二区三区 avav国产 | 老司机在线观看福利网站视频 | 四面虎影最新播放网址 | 欧美xx视频 | 99久久国产综合精品SWAG | 最近中文字幕日韩 | 亚洲一区二区久久久 | 免费黄色在线观看 | 国产精品一品二区三区四区18 | 影音先锋在线中文字幕 | 久久久精品一区AAA片 | 精品久久久99 | 免费看91视频 | 色视频免费在线 | 亚洲永久网站 | 国产强奷女交警在线播放 | 欧美在线99| 性色av一区二区三区 | 欧美性生活视频网站 | 日本精品在线免费观看 | 亚洲成人免费视频 | 精品国产三级在线观看 | 日韩wuma| 国产探花在线观看视频 | 男女啪啪抽搐呻吟高潮动态图 | av国产免费 | 国产精品一区二区精品视频免费看 | 国产精品久久久国产 | 亚洲精品视频在线免费播放 | 午夜无人区免费网站 | 厨房少妇人妻好深太紧了 | 好看的黄色录像 | 欧美一级片在线观看 | 亚洲AV无码专区亚洲AV紧身裤 | 久久精品剧情 | 成年人的视频免费看 | 一级免费黄色毛片 | 99r在线| 欧美高清欧美aⅴ片 |