How to Install Integral Prefabricated Cable Joints? - 2

3 years ago 1257 0 News

In this article, we continue to introduce how to install the cable joints

3. Insulation shielding treatment:

To ensure the contact between the insulation shielding layer and the shielding layer inside the preform, the insulation shielding layer shall be extended. The common methods are coating semi-conductive paint and molding semi-conductive tape.

1) Apply semi-conductive paint: clean the cable insulation with ethanol or another suitable solvent, dry it with a hot-air gun, and protect the insulation with plastic film. Apply two coats of semi-conductive paint on the extended part of the insulation shield. The painting shall be smooth and flat. Dry the semi-conductive paint with a high-power hot-air gun for at least 20min. Protect the treated cable with plastic film.

2) Molded semi-conductive tape: wrap the non-vulcanized semi-conductive tape around the extension of insulating semi-conductive shield, and heat vulcanization with heating tape.

4. Insert insulation perform:

1) Both ends of the cable shall be sleeved with all connecting accessories, respectively. Such as heat shrinkable pipe, copper-sleeve connector.

2) There are two methods for inserting insulating preforms: on-site diameter expansion method and traction method:

Diameter expansion on site: the insulating preforms shall be expanded in a clean and dust-free environment, and the holding time after diameter expansion of the preforms shall not exceed 4H. It is recommended to complete the installation within 2H.

Special tools shall be used for diameter expansion, as shown in Figures 6-6. The inner and outer surfaces of the expanding pipe shall be smooth without sharp corners or damage. The inner and outer surfaces of the expanding pipe and prefabricated parts shall be cleaned and dried with an electric hair dryer before expanding.

Pour silicone oil into one end of the preform and rotate it to ensure that the mandrel is coated with silicone oil. Then, the preform shall be expanded with a special diameter expansion tool, and the expanded preform shall be wrapped with clear plastic film.

Traction: install traction tools on the prefabricated parts, as shown in Figure 6-5. Pull the traction plate by the traction wrenches on both sides to sleeve the preform into the cable.

5. Install Shield:

1) Dig out two grooves on the cable insulation on both sides with special tools.

2) Connect the copper braided tape in the connecting pipe with the braided copper tape in the shield.

3) Install the aluminum shield, and its surface shall not protrude from the insulating surface. Do not rotate the shield at will to prevent the braided copper strip from breaking.

4) Precautions: ensure that the outer diameter of the shield is within the allowable range of the performance.


INQUIRY
主站蜘蛛池模板: 无码乱人伦一区二区亚洲 | 久久久精品99久久精品36亚 | 中文字幕在线免费97 | 国产一级高清毛片 | 久久久久人妻精品一区蜜桃 | 日本a不卡| 久久精品国产网站高清综合 | 中文字幕亚洲乱码 | 欧美xxxx性bbbbb喷水 | 国产精品久久免费视频 | 久久青青草原国产毛片 | 国产一级片免费 | 大帝av在线一区二区三区 | 亚洲va无码va在线va天堂 | 亚洲中文久久久久久精品 | 老牛无码人妻精品1国产 | 欧美一区成人 | 国产一区二区三区不卡在线 | 男人操女人视频免费看 | 黄色影院免费看 | 91视频导航 | 日韩美女在线观看 | 嫩草AV无码精品一区三区 | 欧美日韩久久 | 国产最大成人亚洲精品 | 亚洲国产精品日韩av不卡在线 | 欧美日国产 | 成年女人永久免费观看视频 | 国产宾馆3p国语对白 | 少妇精品久久 | 国产精品久久久久久亚洲色 | 男人的天堂久久久 | 91小视频版在线观看www | 久久午夜精品影院一区 | 日韩草逼 | 久久久国产毛片 | 日本一道aⅴ不卡免费播放 www.黄色免费网站 | 国产乱码久久久久久 | 国产精品久久久久久福利 | 精品久久免费观看 | 超碰人人青青 |