Do you know the general inspection items of Cable ?

2 years ago 1692 0 News

ABC-cable-1024x343.jpg

The purpose of the power cable line test is to detect defects and weak links in time, so as to deal with them in time, and to prevent the defects from expanding and damaging the cables. 

Cables are buried in the ground, because it is not easy to check, and experiments mainly judge the change in insulation performance. 

Therefore, all newly installed power cable lines and running power cable lines should be electrically tested, such as the commonly used CU/PVC ECC cable, flexible PVC cable, and CU XLPE SWA PVC armored cable.


Conductor resistance, insulation thickness, insulation thinnest point thickness, sheath thickness, sheath thinnest point thickness, insulation resistance, voltage, external dimensions, cable stranding direction at 20 °C.


Main Inspection Contents:


Mainly check the cable quality, insulation status, and various tests on the cable line. 

Since the power cable is used to transmit high-power electric energy and work under high voltage and high current conditions, its electrical performance is very high. 

In order to test the cable Performance testing is required for manufacturing and installation quality, reducing operational accidents, and improving power supply reliability.


Safety Precautions For Operational Testing:


1. Testers familiar with the technical test standards and technical regulations should be selected as the primary staff.


2. It is necessary to arrange the test site reasonably and scientifically, to ensure that the tester's range of activities and the minimum safe distance from the live part meets the requirements of the following table.


3. The high-voltage lead-out line of the test equipment should be shortened as much as possible. 

The distance between the grounding body and the unrelated equipment should be kept at a sufficient safety margin to prevent the grounding body and other objects from being discharged during the test and to prevent the induced voltage from being generated by the nearby working equipment. 


4. The tester should concentrate on and operate in an orderly manner. 

When abnormal conditions are found, the boost should be stopped first, followed by depressurization, power failure, and discharge, and measures should be taken to analyze the cause of the abnormality.


5. After the test, the tester should remove the self-installed grounding short-circuit line and conduct a comprehensive inspection of the tested cable to clean up the debris at the work site.


6. Fill in the test record in time, sort out the test report, and restore the equipment lead removed or changed in the test.


Tags:
Power Cable
INQUIRY
主站蜘蛛池模板: 国产成人精品无码片区 | 日日干夜夜草 | 亚洲AV无码专区日韩乱码 | 亚洲国产精品久久久久久 | 亚洲精品乱码久久久久久久久久久久 | 麻豆爱爱 | 二区三区av | 满春阁精品a∨在线观看 | 日韩一区二区在线观看 | 日美一区二区 | 天堂av一区二区 | 无套内谢少妇毛片免费看 | 一本大道大臿蕉无码视频 | 国产免国产免‘费 | av大片在线免费观看 | 国产成人精品一区二区免费看京 | 先锋321夜色资源站 欧美性猛交性大交 | 婷婷午夜激情网 | 香蕉久久av一区二区三区 | 啦啦啦中文在线视频免费观看 | 国产成人女人在线观看 | 一本色道久久HEZYO无码 | 国产精品国产三级国产普通话一 | 免费一对一刺激互动聊天软件 | 九九国产精品入口麻豆 | 亚洲欧美日韩综合久久久久久 | 成人毛片100免费观看 | 特级毛片在线免费观看 | 亚洲国产国语自产精品 | 含着她的花蒂啃到高潮在线观看 | 亚洲精品无码少妇30P | 天天色天天操天天 | 91成品人网页进入入口 | a级毛片不卡在线播放 | 欧美又大又硬又粗BBBBB | 亚洲网站在线观看视频 | 亚洲狠狠爱综合影院网页 | 色天使久久综合网天天 | 毛片久久久久久 | 国产一级一级理论片一区二区 | 国产做a爰片久久毛片a片 |